We provided and installed mechanical HVAC systems for this new four story plus basement in-patient tower addition, including a 2-story above-grade connector and tunnel to the existing hospital building.
Design-assist, 3D BIM and coordination of the mechanical and plumbing systems for a new 3-story plus basement, 78 bed, women’s and children’s facility for neonatal and adult intensive care, including a connector tunnel to existing hospital.
We provided mechanical HVAC and plumbing systems for a new 7-story patient tower, along with minor demolition and remodel of temporary construction connecting corridor & tunnel between new tower and existing hospital facilities.
Design/build and construction for the CA Sutter Medical Building. This project consisted of adding a new hot water boiler with pump, replace VVT boxes, and added distribution piping to the building.