Mercy San Juan Medical Center Healthcare

We provided mechanical HVAC and plumbing systems for a new 7-story patient tower, along with minor demolition and remodel of temporary construction connecting corridor & tunnel between new tower and existing hospital facilities.

Square embellishment

PROJECT DETAILS

LOCATION: Carmichael, CA
PROJECT TYPE: Large Complex Hospital

FINAL CONTRACT VALUE: $15,800,000
COMPLETION: December 2009
SQ FT: 140,000

GENERAL CONTRACTOR: Turner Construction Company
OWNER: Catholic Healthcare West
MECHANICAL ENGINEER: M-E Engineers, Inc.

Square embellishment

DESCRIPTION

New patient tower consists of mechanical penthouse, 4 floors dedicated to individual patient rooms 110 total (90 Med Surg Units, 20 CCU units) and 1 shelled-out floor. Basement level included new in-house pharmacy, storage, engineering shop & mechanical/electrical rooms. New cooling tower & emergency generator yard also constructed as part of the project. To service emergency generator & mechanical system boilers, a complete Fuel Oil system, including 30,000 gallon underground fuel tank included as part of the project. At penthouse level, 2 each, 74,000 CFM air handlers serve dual-duct air delivery system, including 190 dual-duct, constant volume boxes.