Design/Build construction of a new student union building, partial modernization of an existing building and quad modernization.
Lawson Mechanical Contractors assisted with the design and then construction of the mechanical HVAC and plumbing systems. The Student Union at Yerba Buena High School is the first permanent addition to the campus since its original construction. The HVAC system and its controls reflect a forward-thinking, contemporary design philosophy and aesthetic rather than emulating existing technology from the mid-20th Century. This project was named the 2018 DBIA Project of the Year.