Design and construction of the mechanical HVAC and controls systems for two new buildings for a bus maintenance and operations facility.
LOCATION: Stockton, CA
PROJECT TYPE: Design/Build
FINAL CONTRACT VALUE: $1,960,594
COMPLETION: January 2016
SQ FT: 136,310
GENERAL CONTRACTOR: McCarthy Building Companies, Inc.
OWNER: San Joaquin Regional Transit District
ARCHITECT: Dryfuss & Blackford
MECHANICAL ENGINEER: Capital Engineering Consultants
Design and construction of the mechanical HVAC and controls systems for two new buildings for a bus maintenance and operations facility.
New maintenance building containing vehicle repair and work areas, parts storage room, toilet and locker rooms, exercise rooms, office areas and driver’s lounge area. 98,940 SF in total.
New wash and fuel building containing tire repair areas, office, equipment rooms, and outside areas with canopy above for vehicle wash, steam clean, fuel, and brake inspections. 37,370 SF in total.