This project required the complete removal and replacement of the existing roof and HVAC system.
This project included removal of existing built-up roofing system, flashings, gutters and downspouts and replacement with new single-ply roofing system and underlayment, pre-finished fascia’s, gutters and downspouts and flashings; removal of existing HVAC equipment, roof-mounted duct work, miscellaneous curb modifications, and replacement of condensate and gas piping; electrical disconnect of roof mounted equipment and reconnect; new supports for roof-mounted ducting, conduits and piping; replacement of water-damaged sheathing where discovered.