Mechanical and Plumbing construction for The UCDMC Cancer Center Expansion project, consisting of a new three story building.
LOCATION: Sacramento, CA
PROJECT TYPE: Plan/Spec
FINAL CONTRACT VALUE: $3,277,595
COMPLETION: November 2012
SQ FT: 46,490
GENERAL CONTRACTOR: Lawson Mechanical Contractors
OWNER: Regents of the University of California, Davis
ARCHITECT: Smith Group, Inc.
MECHANICAL ENGINEER: Capital Engineering
The three story expansion is linked to the existing building via an enclosed bridge, at level 2. The project includes the addition of a pediatric clinic, pediatric infusion, adult clinic, adult infusion, as well as a new infusion pharmacy serving both departments. The existing building will be occupied during construction, and there will be minimal remodel work at the tie-in locations as well as the lobby on the first floor.