The three story expansion is linked to the existing building via an enclosed bridge, at level 2. The project includes the addition of a pediatric clinic, pediatric infusion, adult clinic, adult infusion, as well as a new infusion pharmacy serving both departments. The existing building will be occupied during construction, and there will be minimal remodel work at the tie-in locations as well as the lobby on the first floor.
$3,277,595
46,490 SF
November 2012
Lawson Mechanical Contractors
Regents of the University of California, Davis
Smith Group, Inc.
Capital Engineering