The Folsom High School Phase 2 Expansion Project posed several challenges for Lawson in a small space.  Preconstruction coordination involved other elements not found on a typical project: acoustic sound dampeing panels, stage lighting, and audio equipment.  These elemsnets were successfully incoporated into the 3D model allowing well exectuted installation by all trades in the field.

Project Details

Location: Folsom, California
Completed: September 2003
Building Size: 10,000 Sq. Ft.
Contract Value: $493,000
Delivery Method: Design-Bid-Build
Client: Folsom Cordova Unified School District
General Contractor: Roebbelen Contracting, Inc.

 
Folsom High School